16.9 C
Nicosia
Friday, March 29, 2024

Road projects in all cities: See which roads are affected to avoid inconvenience

Must read

Road projects in all cities: See which roads are affected to avoid inconvenience

On the Nicosia – Limassol highway, from Monday 18/01/2021 at 09:00 am, until Monday 15/03/2021 at 06:00 am, in the context of the Construction of the Nicosia Perimeter Motorway, the eastern lane of the Nicosia – Limassol Motorway in the direction of Limassol will be closed for traffic from the height of the Latsia Weighing Station to the exit to the Industrial Area of Idali. During the works, the traffic on the Nicosia – Limassol Motorway in the direction of Limassol, in this section, will be carried out with two traffic lanes. The traffic of vehicles from the Nicosia – Limassol highway to the Industrial Area of Idali will be unimpeded.

On the Larnaca – Limassol highway, in the section from Kalo Chorio to Kofinou, during the period 22/02/2021 – 12/03/2021, between the hours of 08:00 am. – 03:00 pm, every day except Sundays and holidays, there will be work on cutting grass and cutting / pruning trees / acacias and picking up useless objects. Traffic will not be affected during the works, which will be carried out on the road support in both directions.

On the Larnaca – Paralimni Airport highway, in the period 25/01/2021 – 25/03/2021, between the hours 08:00 – 15:00 every day except Sundays and holidays, in the section from Larnaca Airport to the exit to Xylofagou and from in both directions, there will also be work on cutting grass and cutting / pruning trees / acacias and picking up useless objects. During the execution of the works, which will be carried out on the road support, the traffic will not be affected.

Also on the Larnaca – Paralimni Airport highway, road repair works will be carried out, in the period 01/03/2021 to 26/03/2021, every day except weekends and holidays, between the hours of 08:00 am. and 02:30 pm. During the works, in the section of the highway from Larnaca Airport to the Rizoelia roundabout, one traffic lane will be partially closed for a length of 1000m. about, and traffic will be diverted to the adjacent lane.

On the Paphos – Limassol highway, at the height of the Community of Mandria, on Thursday 04/03/2021, from 08:00 to 17:00, maintenance works will be carried out on both lanes in the direction from Limassol to Paphos. During the works, the traffic from Limassol to Paphos will be channeled through the opening of the highway, near the village of Mandria, in the opposite direction, which will be used for two-way traffic. Traffic will return through an opening near the East area.

In sections on the highways Nicosia – Limassol, Nicosia – Larnaca and Nicosia – Kokkinotrimithia, from Monday 18/01/2021 until the end of May 2021, except Friday, Saturday and Sunday, from 08:00 pm every day until 06 : 00 the next morning, road repairs will be carried out. During the works, sections of the highways of approximately 1000 meters will be closed and traffic will be diverted in the opposite direction, where traffic will be two-way.

In the city of Nicosia, from 27/02/2021 and for a period of three months, the traffic lights at the intersection of Makarios Avenue, with Ethnikis Frouras Street, next to the Landmark Hotel (former Hilton), move 15 meters south to complete the construction works on Ethnikis Frouras Street. Specifically, the connection between Makarios Avenue and Kallipoleos Avenue will be carried out entirely through the temporary bypass of Ethnikis Frouras Street. It is noted that, for vehicles moving from Limassol to Nicosia, the crossing to Halkokondyli Street should be through Filimonos Street, while the clockwise movement to Ethnikis Frouras Street will be carried out normally.

Also in the city of Nicosia, on Thursday 04/03/2021 and Saturday 06/03/2021, between the hours 06:00 – 15:00, on Themistokli Dervi Street, works will be carried out for the construction of an apartment building. During the works, the two traffic lanes of Themistoklis Dervi Street in the direction from the Gavriilidis Traffic Lights to Nicosia, between the Nikokreontos and Tefkrou lanes will be closed and the traffic will be channeled in one lane in the opposite direction.

Also in the province of Famagusta, sections of the roads Sotira – Liopetri and Sotira – Paralimni, will remain closed for traffic due to road works, which will be carried out during the period from Wednesday 03/03/2021 until Friday 12/03/2021, except Sunday, between the hours of 07:30 p.m. and 06:30 p.m.

On the old road Nicosia – Limassol, the period 22/02/2021 – 02/04/2021, between the hours of 07:00 am. – 04:00 pm, every day except weekends and holidays, construction works of water pipes will be carried out by the Department of Water Development. During the works, part of a road lane, from 'Stavrovouni Reservoir', to the WFD pumping station in Kofinou, in the direction of Kofinou, will be partially closed in a length of approximately 100 meters (total length 930 meters, approximately) and traffic will be diverted to the adjacent lane, using temporary traffic lights.

During the period 01/03/2021 – 04/03/2021, on the old road Nicosia – Limassol, periodic maintenance works of the road will be carried out, in the section of the road from Mosfiloti to the exit of Stavrovouni, from 07:30 in the morning until 03: 00 in the afternoon, daily. During the works, one lane of the road Mosfilotis – Kornos – Stavrovouni will be closed in sections for 100 meters at a time and the traffic will be channeled to the adjacent lane, using stop & go and / or temporary traffic lights.

Road maintenance works will be carried out on the road to Kalavasos, in the period 05/03/2021 – 08/03/2021, from 7.30 in the morning until 3.00 in the afternoon, daily except Saturdays, Sundays and holidays, in the road section from the exit of the highway until before entering the Community of Kalavasos. During the works, one lane of the road to Kalavasos will be partially closed for 100 meters at a time and the traffic will be channeled to the adjacent lane, using stop & go and / or temporary traffic lights.

On the Limassol – Nicosia highway, in the underground vehicle crossing at the uneven junction of Parekklisia, on Sunday 07/03/2021, from 07:00 to 15:00, works for the construction of a sewage system will be carried out by SALA. During the works, one traffic lane will be partially closed. The traffic will be channeled in the adjacent traffic lane and the traffic will be managed with the “STOP & GO” system.

Yellow Warning for Heavy Storms – Chance of Snow in the Higher Mountains

Five points for free rapid test today in Paphos – Pancyprian Sampling Units (table)

Source: politis.com.cy

- Advertisement -AliExpress WW

More articles

- Advertisement -AliExpress WW

Latest article